Budget vs actual, before the overrun lands
Drop in a job-cost export; get back budget vs actual/committed with variance and % spent per cost code, rolled up by category, plus projected over/under at completion.
Drop in
job cost lines (JSON or CSV)
Optional: min_budget_usd (0 = all), project_label
Get back
- cost_line_items register
- by_category summary
- total_variance_usd
- projected_variance_usd
- total_overrun_usd
Cost overruns caught — computed from your data
These fields appear in the XLSX/PDF artifact after a run on your own data.
How it runs
What every run guarantees
Deterministic
Byte-identical replay, 100% across 10,200+ controlled runs.
Fast
Compiled logic runs in seconds. Batches process at 25,000+ rows/sec.
Confirmed
A named human confirms the compiled logic once — the model is out of the loop on every run.
Auditable
Every artifact is SHA-256 content-addressed and hash-linked.
Usage-based
You pay per run, not per seat.
Run it on your file
10 free runs. No credit card. No setup. Drop in your export and get the register back in seconds.
Already have an account? Sign in →